Sign In | Join Free | My chinacsw.com |
|
Brand Name : Kaixiang
Model Number : AC120/240V-4kW
Certification : ISO9001
Place of Origin : China
MOQ : 1 set
Price : negotiable
Payment Terms : L/C, T/T, Western Union
Supply Ability : 150 Sets / Month
Delivery Time : Within 20 days
Packaging Details : Packaged in wooden cases
Model : AC120/240V-4kW
Rated power : 4 kW
Voltage : AC120/240V
PF(Power Factor) : 1
Insulation Grade : F Class
Load Tolerance : +(0-10%)
AC120/240V-4kW Rack Mounted Load Bank With Frequency 60HZ And Best Sales
Introduction
AC120/240-4kW Rack Mounted Load Bank, which can be used as terminal load test connectivity and reliability of power periodic line, safety of electric transmission line, battery.etc. Coordinate other power switchover. Also be used as simulate heat source of rack mounted server, test the air cooling system and air flow control.
Application
AC120/240V-4kW Rack Mounted Load Bank With Frequency 60HZ And Best Sales
When building a data center, any unexpected glitch during commissioning can cause serious project delays, wasted productivity, and significant budget overruns. So integrating rack mounted load banks into the design phase can help our data center clients keep projects on budget and on time.
Technical specification
Parameter | |
Rated voltage/frequency | Single phase120/240VAC/60Hz |
Max Load Power | Resisitive Power: 4kW(120V or 240V) |
Load Resolution | Resistive Load: 2 steps. A circuit 2kW; B circuit 2kW |
Power Factor | 1 |
Load Tolerance | +(0~10%) |
Insulation Grade | Grade F |
Way of Working | Continuous Working |
Cooling | Forced air cooling, intake air in front and exhaust cooling in back |
Case Color | Black |
Case Dimension | About 430mm*600mm*178mm(L×W×H) |
Weight | About 18kgs About 18kgs |
| |
Ambient Temperature ttTeTemperatureTemperature Temperature | -10℃~+40℃ |
Relative Humidity | ≤95% |
Altitude | ≤2500 meters |
Atmospheric Pressure | 86~106kPa |
Work Indication : green means working power connect successfully.
Fault Indication: Red with alarm means the machine is under protection state.
Voltage change-over switch: When A circuit,B circuit connect 120V working power supply,switch point to【120V】;When A circuit, B circuit connect to 240V working power supply,switch point to【240V】.
Fan Power Switch:pull this switch upward, fan start to operate.
![]() |
Portable Resistive Rack Mounted Load Bank 4 KW Power For Data Center Images |